SUNRISE SAI OZONE PLAZA

Booking plan
The Specification
STRUCTURE:
R C C frame structure as/structural drawing with 200/100th R.CC wall.
DOORS:
MainDoor:125*62.5mm thick SalWood Frame,Shutter 35/32 mm frame including decorative wooden bead around solid core flush door (GreenPly/Century/Mayor/Alpro)make
TOILETDOOR
125*62.5 mm sal woodframe including decorative wooden bead around solid core flush door(GreenPly/Century/Mayor/Alpro) or equivalent make finish with enamelpaint.
INTERNAL DOOR
125*62.5 mm thick sal wood frame including decorative wooden bean around. Solid core flush door (GreenPly/Century/Mayor/Alpro) or equivalent make finish with synthetic enamel
WINDOWS:
Aluminium/Wooden frames and shutters with 4mm the clearglass including m.s.grill.
FLOORING:
Main Lobbies -Granite/Marble
Common Lobbies and Corridor-Granite/Marble
Staircase - Granite/Marble
Parking - Granite/Marble
Offices & Shops-Vitrified tile
APARTMENT FLOORING:
Living & DiningRoom -Vitrified tile
Master BedRoom -Vitrified tile
Kitchen &Utility -Anti skid vitrified tile
Toilets -Anti skid ceramic tile
Balconies -Anti skid ceramict ile
KITCHEN:
Granite counterwith stainless sink of ISI mark
CAMPUS:
Pathway and Driveway -Cement interlocking tiles
DADO:
Liftlobbies -Vitrified/Granite/Decorative tiles
Toilets - Glazed ceramic tiles,Dado upto7 height
Kitchen -Glazed ceramic tiles up to 2 ht above counter
TOILETS:
White glazed vitreous washbasin of Parryware/Hindware or equivalent make in all toilet.
White glazed vitreous EWCs of Parryware/Hindware or equivalent make in all toilets
Hot & Cold water wall mixer ofJaquar/Parryware or Hindware equivalent make in all toilets
Acrylic/Fiber glass cisterns in white color in toilets.
Health faucet in all toilets.
PAINTING & CLADDING:
Internal walls & Ceiling-Plaster of paris over plaster surface only.
External Finish-Exterior grade cement paint and part of surface finish with exterior grade texture paint or equivalent make.
MS Grill Synthetic enamel paint of approved color &shade
SS RAILINGS:
ELECTRICAL OUTLINE SPECIFICATION
All electrical wiring in concealed PVC conduit and using insulated copper wires of RR Kable/Anchor or equivalent make Modular switchesof Anchor/Roma or equivalent Adequate lighting/Power point socket
and outlets in each room.AC POINTS:
All offices,Shops,Bedrooms,&Livingrooms:Provision for spiltAc(wiring and internal and external socket point only)
TV POINTS:
Living room and Master Bedroom Complete with wiring & outlet
Tvwiring upto the ducts from living and master bedrooms only
TELEPHONE POINTS:
Living-Complete with wiring
Offices&Shops-Only conduits no wiring &outlet.
Exhaust Fan Point-Complete with wiring &outlet in all toilet and kitchen
Water Purify Point-Complete with wriring outlet in kitchen
Washing Machine Point- Complete with wiring & outlet in utility
Security System-CCTV for ground floor common area and campus. Intercom from main security cabin to all apartments.
Generator- Kirlosker/Mahindra or equivalent silent generator of adequate capacity
WATERPROOFING:
Terrace and Sunken slab water proofing by Dr.Fixit/Chokseychemicals or equivalent
BORING AND TUBEWELL:
Boring and tubewell of adequate capacity with adequate size ISI marksISI mark submersible pump
LANDSCAPE WORK:
Campus landscaping work shall be done as per design,drawing and specification on given by architect.
PaymentPlan
The consideration amount will be paid as per the Following schedule.
At the time of booking.......10%
1st Installment after completion of Second roof slab .....17.50%.
2nd Installment after completion of Third roof slab......7.50%.
3rd Installment after completion of Fourth roof slab.....7.50%
4th Installment after completion of Fifth roof slab....7.50%
5th Installment after completion of Sixth Roof slab.....7.50%
6th Installment after completion of Seventh roof slab.....7.50%
7th Installment after completion of Eighth roof slab....7.50%
8th Installment after completion of Ninth roof slab....7.50%
9th Installment after completion of Brick Work ....7.50%
10th Installment after completion of Plaster Work ....7.50%
Final Installment at the time of Completion ....05%
Location Map
