Sunrise Ashoka Complex

Specification
Foundation
R.C.C. Piling,Seismicdesign as per structural designer.
Structure
R.C.C. frame structure(Steel- Tata Tiscon/Sail/ISI mark & Cement- Ultratech/ACC/ISI Mark).
Civil work
1st class B/W with cement mortar/AAC Block.
Roof
R.C.C. water proof with white roof tiles.
FLOORING
Vitrified Tiles (Make- Somani/ Kajaria /RAK)
PLASTER
Cement mortar wall 1:6, ceiling 1:4.
DOORS
Entrance door of decorative teak veneer/laminated flush door with Godrej Lock all other design flush door with S.S. fittings.
Door frame
Sal Wood.
Window
UPVC window with glass.
Kitchen
Granite kitchen platform with stainless steel sink & glazed tile dado up to 2 ft. height. Provision for hot & cold water in sink, exhaust fan space in window.
Toilet
Provision for hot & Coldwater system.Glazed tiles in eye soothing colour on wall up to lintel level & anti kid flooring and Granite chaukhat. White sanitary ware and fixtures of Jaguar.
Electrical
Concealed electrification with fire resistant wire & Modular switches of ISI make. Provision for adequate light and power distribution with MCB’s (Wire Make-Havells/RR Kabel/Anchore & Switche Make – Roma/ABB/Havells).
Plumbing
As per PHE designer.
DG & Lift
Common silent DG & Lift.
Tubewell
Common Submersible Pump.
Inside & Outside Painting work
Weather Coat exterior paint & internal Plaster with Wall putty.
Security System
CCTV for ground floor common area and campus. Intercom from main security cabin to all apartments.
Balcony
Steel Railing.
(Note:All specifications,design,layouts,conditions etc. are only indicative and some of these can be changed at the discretion of the builder.They are purely conceptual and not a legal offence).
PaymentPlan
The consideration amount will be paid as per the Following schedule.
At the time of booking 10%
1st installment after completion of Foundation- 15%
2nd installment after completion of First (Basement) roof slab- 7%
3rd installment after completion of Second roof slab- 7%
4th installment after completion of Third roof slab 7%
5th installment after completion of Fourth roof Slab 7%
6th installment after completion of Fifth roof Slab 7%
7th installment after completion of Sixth roof Slab 7%
8th installment after completion of Seventh roof Slab 7%
9th installment after completion of Eighth roof Slab 7%
10th installment after completion of Brick work 7%
11th installment after completion of Plaster work 7%
Final installment at the time of Completion 5%