Sunrise Sai Enclave

Specification
STRUCTURE
RCC Frame Structure as per structural Drawing.
BRICK WORK:
AAC block
DOORS
Main Door-Decorative Both Side Laminate /Pasted flush door & Other doors- Both side laminated flush door with painted Sal/Hard Wood door frames.
WINDOWS:
UPVC sliding window with 4mm thick clear glass including M.S. Grill.
FLOORING
Living & Dining Room - Vitrified Tile. Master Bed Room- Vitrified tiles Balcony- Vitrified tiles Kitchen - Vitrified tile. Toilets - Anti skid tiles.
KITCHEN
Granite counter with stainless sink of ISI mark. Glazed ceramic tiles, upto 2'ht above counter.
FLOORING
Vitrified Tiles
WALL TILES
Toilet-Glazed ceramic tiles, Dado upto 7'0'' height.
TOILETS
White glazed vitreous wash basin of Parryware/Hindware/Jaquar or equivalent make in all toilets. White glazed vitreous EWCs of Parryware/Hindware/ Jaquar or equivalent
make in one toilets. Hot & Cold water wall mixer of Jaquar /Parryware/ Hind Ware or equivalent in all toilets. Wall Hung EWC of Jaquar / Parryware /
Hind Ware or equivalent make in one toilets. Acrylic /Fibre glass cisterns in white colours in toilets. Health faucet in one toilets.
BALCONY RAILING
Stainless Steel.
PAINTING & CLADDING
Internal Walls & Ceiling - Wall Putty over Plaster surface only.
External Finish
Exterior grade cement paint ant part of the surface finish with exterior texture grade paint or equivalent make.
MS Grill
Synthetic enamel paint of approved colour & shade.
ELECTRICAL OUTLINE SPECIFICATIONS:
All electrical wiring in concealed PVC conduit and using insulated copper wires of RR Kabel / Anchor or equivalent make Modular switches of Anchor / ABB or equivalent.
Adequate Lighting/Power point socket and outlets in each room.
TV POINTS
Living room & Master Bedroom: Complete with wiring and outlet. TV wiring upto the ducts from living and master bedroom only.
TELEPHONE POINTS
Living- Complete with wiring Exhaust Fan Point- Complete with wiring & outlet in all toilet & kitchen. Water Purifier Point- Complete with wiring outlet in Kitchen.
Washing Machine Point Complete with wiring & outlet in utility..
Security System
CCTV for ground floor common area and campus. Intercom from main security cabin to all apartments.
Generator
Kirloskar / MAhindra / ashok Leyland or equivalent silent generator or adequate capacity.
WATERPROOFING
Terrace Roof Tiles over RCC Slab Water Profing
BORING AND TUBE WELL
DEEP Borewell of adequate capacity with adequate size ISI mark submersible pump.
(Note:All specifications,design,layouts,conditions etc. are only indicative and some of these can be changed at the discretion of the builder.They are purely conceptual and not a legal offence).
PaymentPlan
The consideration amount will be paid as per the Following schedule.
At the time of booking.......10%
1st Installment after completion of Foundation.....15%.
2nd Installment after completion of First (Basement)roof slab......10%.
3rd Installment after completion of Second roof slab.....10%
4th Installment after completion of Third roof slab....10%
5th Installment after completion of Fourth roof slab.....10%
6th Installment after completion of Fifth roof slab....10%
7th Installment after completion of Brick Work.....10%
8th Installment after completion of Plaster Work.....10%
Final Installment at the time of Completion.....05%