SUNRISE SAI TOWER

Booking plan
Specification
STRUCTURE
Building designed with R.C.C framed structure (Earthquake resitant).
FLOORING
Entire floor of the flats will be Vitrified Tiles & Common space will be of Marble.
DOORS
Entrance door of decorative teak veneer flush door with brass fitting & all other flush door with alluminium fitting.
WINDOWS
Aluminium sliding window with glass and grill.
KITCHEN
Granite Kitchen platform with stainless steel sink and glazed the dado upto 2 ft. height Provision for hot and cold water in sink,exhaust fan space.
BATHROOM
Provision for hot and cold water system.Glazed tiles in eye soothing color on wall up to lintel level. While sanitary ware and fixtures of standard ISI make
ELECTRICAL
Concealed electrification with fire retardant cables and switches of ISI make.Provision for adequate light and power point,Tv and telephone point in living and master bed.Power distributions with MCB's.
PLASTER Water Proof exterior plaster and permanent alage paint,interior plaster with P.O.P
SERVICES&AMENTITES
Water Supply-24 Hours Water Supply through overhead tank from deep tube well.
Generator facility-Silent Generator for common area,water pump,lift &300 Watt to the Each Flat;.
Lift-Two Nos. Lift for Each Block.
Fire Fighting System-As per norms.
Intercom-Provision of Intercom with one Nos Hand Set to Each Flat.
CCTV-CCTV Camera in Campus
(Note:All specifications,design,layouts,conditions etc. are only indicative and some of these can be changed at the discretion of the builder.They are purely conceptual and not a legal offence).
PaymentPlan
The consideration amount will be paid as per the Following schedule.
At the time of booking.......10%
1st Installment after completion of Foundation.....25%.
2nd Installment after completion of First roof slab......10%.
3rd Installment after completion of Third roof slab.....10%
4th Installment after completion of Fifth roof slab....10%
5th Installment after completion of Seventh roof slab.....10%
6th Installment after completion of Brick Work....10%
7th Installment after completion of Plaster Work.....10%
Final installment at the time of Completion.....5%
Location Map
